ZUBAIR OILF FIELD DEVELOPMENT PROJECT – INITIAL PRODUCTION FACILITIES – BASRA GARRAF, IRAQ
CLIENT
WEATHERFORD
SCOPE:
PRODUCT RANGE
ERECTION / INSTALLATION OF :
TANK FARM PIPE RACKS
PRODUCED WATER PIPE RACKS
TANK FARM SLEEPERS
PRODUCED WATER SLEEPERS
UTILITY SLEEPERS
MAIN TANK FARM
POWER GENERATION UNITS
CRUDE OIL EXPORT AREA
NORTH/SOUTH PIPE RACKS
FLARE AREA
GAS COMPRESSION PIPE RACKS
EXECUTION TIME PERIOD:
2 YEARS (2013 – 2015)
Rehabilitation of Iraq south Gas Facilities-WO #10 West Qurna-Gas Interfface Facilities for WQ CS-7&8
CLIENT
UNAOIL / WorleyPersons / Basrah Gas Company
SCOPE:
DESIGN
DETAILED ENGINEERING,
MATERIAL PROCUREMENT, FABRICATION, TESTING, ASSEMBLY, INSULATION, ELECTRICAL & FAT.
PSV/PCV SKIDS – 6 X 15 TONS EA
EXECUTION TIME PERIOD:
4 MONTHS
HOPPER PIPING/JET SHEAR SKIDSILO, CONVEYING BOOM, HOPPER & CONVEYING BRIDGES FOR ALUMINIUM SMELTER PROJECT, UAE
CLIENT
RTA ALESA / EMIRATES ALUMUNIUM
SCOPE:
ENGINEERING DRAWINGS,
MATERIAL PROCUREMENT, FABRICATION, TESTING, ASSEMBLY AND PAINTING
TOTAL WEIGHT: 1200 TONS
EXECUTION TIME PERIOD:
10 MONTHS
ALUMINIUM SMELTER PROJECT
CLIENT
RTA ALESA / EMIRATES ALUMINIUM ABU DHABI
SCOPE:
SITE ERECTION OF CONVEYING BOOMS AND CONVEYING BRIDGES
HEIGHT: 30 MTRS
TOTAL WEIGHT : 450 TONS
EXECUTION TIME PERIOD:
8 MONTHS
MUD SYSTEM 2000 BBL / 2500 BBL, SHAKER TANK / INTERMEDIATE TANK
CLIENT
Mi SWACO
SCOPE:
ENGINEERING DRAWINGS, MATERIAL PROCUREMENT, FABRICATION, TESTING, ASSEMBLY AND PAINTING
TOTAL WEIGHT: 800 TONS
EXECUTION TIME PERIOD:
8 MONTHS
HOPPER PIPING/JET SHEAR SKID
CLIENT
PETROCHEM/CHEVRON
SCOPE:
ENGINEERING DRAWINGS,
MATERIAL PROCUREMENT, FABRICATION,
TESTING, AND PAINTING
TOTAL WEIGHT: 60 TONS
EXECUTION TIME PERIOD:
8 WEEKS
CONVEYING BOOM ASSEMBLY FOR ALUMINIUM SMELTER PROJECT, SAUDI ARABIA
CLIENT
RTA ALESA / BECHTEL / MAÁDIN
SCOPE:
ENGINEERING DRAWINGS,
MATERIAL PROCUREMENT, FABRICATION,
TESTING, ASSEMBLY AND PAINTING
LENGTH: 40M
DIAMETER: 4.6 M
WEIGHT: 300 TONS
EXECUTION TIME PERIOD:
EXECUTION TIME PERIOD:
5 MONTHS